Turn on the paver.
Heat the leveling device. If it is an a electric asphalt paver, all you need to do is turn it on. If it is propane, you need to allow the propane burners to heat up to 250 degrees before use.
Begin to pave your start pad by creating a block in a 2-foot by 4-foot pattern.
Turn on your conveyors. Next, turn on your augers. Dump the asphalt into the paver hop machine. Tip the machine backward to raise the depth of the pavement. Tip the machine forward to lower the depth of the pavement.
Turn off the machine when you are finished paving the asphalt.