Excavate your new fancy concrete step location, by removing anything in the way of the work including: existing steps, dirt or pruning back bushes in the way.
Build wooden forms into the shapes of the desired steps. Screw fancy edge foam blocks to inside of the form against the riser faces.
Add concrete mix to wheelbarrow first and add water second mixing with the shovel and mix concrete to manufacturer's specifications. For larger jobs have a truck of premixed concrete delivered to the site.
Use shovel carefully to work concrete into fancy foam forms to make sure there are no trapped air pockets.
Use the float board to flatten the tops of the concrete steps.
Remove the wooden forms after the concrete hardens which will take 24 to 48 hours.