Calculate in square feet the surface area requiring additional topsoil. For rectangular and square areas, the surface area is the length multiplied by the width. For odd shaped areas divide the land into a number of small rectangles and add the individual surface areas together. For example, divide an "L" shape plot into two rectangles, and then combine their areas.
Determine in inches the depth of additional soil required. The depth may vary according to the intended use. For example, a lawn requires approximately four to six inches of topsoil, though a vegetable garden may benefit from as much as 10 to 12 inches.
Multiply the depth in inches by 0.0834, the decimal equivalent of 1/12, to convert it into a decimal value. For example, 14 inches is 1.168 feet -- 14 x 0.834 = 1.168.
Multiply the surface area by the depth to calculate the volume of topsoil required. For example, an area of 50 square feet requiring six inches of topsoil requires 25 cubic feet of soil -- 50 x 0.5 = 25.